Water Rates

January 1, 2025, Water and Wastewater Usage Charges

January 1, 2025, Water Rates - Volumetric Portion of charge based on the amount of water used each month 
BlockWater Supply (based on consumption)Rate ($ per m3)m3
10-70.00First 7
2>7-152.5844Next 8
3>15-253.3227Next 10
4>25-353.6919Next 10
5>35-2501.4030Next 215
6>250-7,0001.3291Next 6,750
7>7,000-50,0001.2111Next 43,000
850,000 +1.0782Over 50,000
January 1, 2025, Sewer System/Wastewater Rates - Volumetric Portion of charge based on the amount of water used each month
BlockSewer System Charge (based on consumption)Rate ($ per m3)m3
10-70.00First 7
2>7-152.4860Next 8
3>15-253.1963Next 10
4>25-353.5514Next 10
5>35-2501.3492Next 215
6>250-7,0001.2785Next 6,750
7>7,000-50,0001.1648Next 43,000
850,000 +1.0371Over 50,000
January 1, 2025 Infrastructure Connection Charges
Water Rates- a fixed monthly charge component based on the size of your water meter as of January 1, 2025
Monthly Water Connection Charge Based On Meter SizeWater Connection Charge ($/month)Wastewater Connection Charge ($/month)
16 mm$18.15$16.63
19 mm$27.21$24.92
25 mm$45.36$41.55
40 mm$90.73$83.09
50 mm$145.17$132.94
76 mm$317.53$290.81
100 mm$544.35$498.50
150 mm$1,270.16$1,163.21
200 mm$2,177.40$1,994.03
250 mm$2,721.90$2,493.26
January 1, 2025, Stormwater Charges Based on Class and Land Size
Stormwater Charges Based on Class and Land SizeStorm Drainage Charge ($/month)Storm Drainage Charge ($/hectare/month)
Residential/Commercial/Institutional/Industrial Equal to or Less Than 0.4 Hectares$20.26 
Residential, land area equal to or below 0.40 hectares without a storm sewer within 90m of property$15.23 
Land area above 0.40 hectares $168.66
January 1, 2025, Fire Protection Charge
Fire Protection Charge ($/month), effective January 1, 2025Customer Assistance Fund ($/month)
Residential$1.86$0.25
Institutional, Commercial, Industrial (ICI) 5 Hectares or Less$12.45 
Institutional, Commercial, Industrial (ICI) Over 5 Hectares$62.23